CLT-1 Data Center

Located in Mooresville, NC, our newest data center benefits from its unique location. Our facility has a Heavy Power Distribution Substation located on premises and is directly connected to the two Duke Energy power generation plants near Lake Norman, ensuring high capacity access to North Carolina’s highest availability network and plentiful green and renewable hydro energy. A carrier-neutral facility, access to several major long-haul fiber carriers and their MPLS networks is delivered through diverse route entry into dual Meet-Me rooms.

GIGA Data Centers is converting the existing building into a data center fully compliant to Tier III1 standards.

WindChill™ Modular Enclosure Provides Best Efficiency

  • High efficiency with PUE of 1.15 guaranteed, attained through our proprietary cooling with hot & cold aisle containment
  • Each rack cabinet bay is customizable to support power & cooling from 7kW to 50kW per 52U Rack
  • Dual-path (A+B) Redundant Power Distribution for Concurrent Maintenance
  • N+1 High Efficiency UPS & Power Systems standard
  • N+1 Backup Power Generator Sets standard
  • 2N or 2N+1 configuration support is available

Security and Access Control

  • 24x7x365 Security Guard monitoring of all premises
  • Multiple Layers of Physical Security
    1. Security fencing surrounds site and all entrance gates
    2. Three-factor authentication with biometrics required to access Data Hall and can be provided to each 5-, 10- or 20- rack Enclosure
    3. Security badge, combination lock or keyed locks to access individual rack cabinets
  • Security cameras positioned outside and throughout interior of site provide complete monitoring of all doorways, entrance and egress points
  • Lightning protection & perimeter grounding system installed
  • VESDA Fire Detection system with Dual Interlock pre-action sprinkler system

Standards Compliance

  • SSAE16 and SOC 2 Type II compliance certification, including HIPAA and PCI DSS 3.1

Download the spec sheet

GENERAL

Renovation Initiated 2018
Campus 21.25 acres
Total Building SF 165,800 sq. ft.
Main Data Hall SF 120,000 sq.ft. / 60MW
Building Construction Concrete slab-on-grade and structured steel, wind-rated more than 150mph
Structure Rating Data Hall FM-120; Office FM-90 Risk Category IV building
Loading Dock 3 Dock Bays, 6 Drive-in Bays
Office Space Dedicated: Available for rent Shared: Conference rooms and drop-in office cubicles
Storage Space Available for rent
Access 24 x 7 x 365
PUE Guaranteed 1.15 at all utilization rates
Design Tier III+* Facility
Reliability SLA 100% Uptime SLA

1. “Tier III” and the Tier Classification System are copyrights owned by the Uptime Institute, LLC

TELECOMMUNICATIONS

Telco Duct Banks Two diverse conduit entrances
Carrier Neutral Multiple carrier providers
Available Carriers CenturyLink/Level(3), Sprint, Windstream, Comcast, Telia, Zayo, AT&T, Cogent, Continuum
Meet-Me Rooms Two diverse MMRs
Exchange Access ATL & CLT Internet Exchange
Public Cloud AWS and Azure direct

POWER

Utility Power Duke Energy Heavy Power Distribution Substation on premises
Available Power Initial Build: 4 MW / Full Build: 60 MW
UPS Concurrently maintainable, N+1 and 2N supported
Generators N+1 Power Block redundancy
Distribution Redundant A+B distribution systems to each Cabinet/POD
Power Metering Revenue-grade, real-time metering available to rack/POD